
MAINTENANCE
36 ZT370 Operation Manual
Perform the following procedures after the
first 50 hours of operation.
• Lubricating the engine coupler
• Changing the stern-drive oil
■ Lubricating the engine coupler
Lubricate the engine coupler every 50
hours if operated at idle for prolonged
periods of time.
Note: The stern-drive may be equipped
with a sealed engine coupler. The
sealed coupler and shaft splines can
be lubricated without removing the
stern-drive.
Apply approximately 8 to 10 pumps of
grease to the engine coupler grease fitting
(1, Figure 2) to lubricate the engine
coupler splines through the grease fittings,
if equipped. Use a typical hand-operated
grease gun to apply the grease.
Figure 2
Note: Lubricate the coupler on the ZT370
model every 50 hours if the vessel is
operated at idle for prolonged
periods of time.
■ Changing the stern-drive oil
See Changing the stern-drive oil on
page 41.
After Initial 50 Hours of
Operation
Description Where used
Multi-purpose heavy-duty type
lithium grease, NLGI #2
Coupler
ZT370_OM.book 36 ページ 2013年9月27日 金曜日 午前10時16分
Necesito manual de reparación completo por favor.